BG Group commits to Aussie spend

BG Group and its Asian partners in the $US20.4 billion Queensland Curtis LNG venture have given the go-ahead for a further $1.7 billion of investment to drill up to 400 more wells to maintain gas supply, providing a welcome lift to resources industry spending.

Drilling for the ‘Charlie’ project will take place over the next two years in permits west of Wandoan in the Surat basin, with Leighton Contractors winning the main contract to carry out the work, which will create up to 1600 jobs.

The large investment underscores the ongoing spending commitment required by the coal seam gas-based LNG projects in Queensland, which need to keep drilling new wells every year to maintain gas supplies for their export plants in Gladstone. BG started shipments from its QCLNG venture in January, marking the first ever gas exports from Queensland, and has so far delivered 62 cargoes to Asia.

Other articles like this can be found at seafasten.com/blog

 

Original article http://www.smh.com.au/business/energy/ bg-partners-to -spend-17b-on-drilling-for-qld-lng-venture-20151113-gkykmz. html

 

Petrobras P-37 Shuts Down

Petrobras is suspected shutdown production at a floating unit on the Marlim field off Brazil after a small oil leak was spotted.

The Brazilian state giant halted output at the P-37 floating production, storage and offloading unit on the field in the Campos basin following reporting of the leak by oil union workers.

It is thought that amount of oil spilled is less than 1000 litres.

However, emergency procedures were followed and relevant authorities were informed.

Other articles like this can be found at seafasten.com/blog

Original Article http;//www.upstreamonline.com/live/1416514/spill- shuts-petrobras-p- 37